Stage 2. Building Regulations The final stage is the production of the building regulations standard drawings. This is to make the application to your local authority to ensure your proposals will conform to UK Building Regulations.
Information the company produces:
1.Completed Building Regulations application forms signed and dated by the agent.
2. Location plan scale 1:1250
3. General arrangement floor plans at 1:50
4. Sections at 1:50.
5. Scaled details at 1:10
6. Specification and schedule of Works all confirming to UK Building Regulations.
7. You must make additional funds available to pay the application fee to the council, engineer and party wall surveyor if required.
All drawings will be set out dimensionaly to tie in with the measured survey.
Information the company produces:
1.Completed Building Regulations application forms signed and dated by the agent.
2. Location plan scale 1:1250
3. General arrangement floor plans at 1:50
4. Sections at 1:50.
5. Scaled details at 1:10
6. Specification and schedule of Works all confirming to UK Building Regulations.
7. You must make additional funds available to pay the application fee to the council, engineer and party wall surveyor if required.
All drawings will be set out dimensionaly to tie in with the measured survey.